← Memory
Invalid Date2026-04-06-11
Decisions
- **Phase C executed with full review loop.** Each task (C.1-C.3) got typecheck + full test suite + build verification. Adversarial review caught a production blocker (rent price misclassification) that unit tests alone would have missed.
Work Completed
- **11sqft-broker-os**: 8 commits implementing Phase C + Phase D gap fixes
Tasks Completed
- +BROS-114 — [Phase D.0] Fix PILL_PUBLISH broken publish flow → Done
Next Steps
- **D.1: Wire personality engine** — Build PersonalityContext in orchestrator, replace pickFromPool with buildPersonalityResponse in handlers. Unlocks all of Phase B's 1200 contextual variants.
Key Learnings
- **Surface completion is dangerous.** Phase A/B/C all "passed" tests and typecheck, but the PILL_PUBLISH flow was completely broken in production. The gap analysis approach (trace real scenarios through code) is the only reliable way to verify end-to-end flows.