Secure Terminal

JARVIS

>_

ENCRYPTED CONNECTION

Jarvis Command Palette

Search commands, navigate, or take actions

JARVIS
0/0
0%
← Memory

2026-04-06-11

Invalid Date

Decisions

  • **Phase C executed with full review loop.** Each task (C.1-C.3) got typecheck + full test suite + build verification. Adversarial review caught a production blocker (rent price misclassification) that unit tests alone would have missed.

Work Completed

  • **11sqft-broker-os**: 8 commits implementing Phase C + Phase D gap fixes

Tasks Completed

  • +BROS-114 — [Phase D.0] Fix PILL_PUBLISH broken publish flow → Done

Next Steps

  • **D.1: Wire personality engine** — Build PersonalityContext in orchestrator, replace pickFromPool with buildPersonalityResponse in handlers. Unlocks all of Phase B's 1200 contextual variants.

Key Learnings

  • **Surface completion is dangerous.** Phase A/B/C all "passed" tests and typecheck, but the PILL_PUBLISH flow was completely broken in production. The gap analysis approach (trace real scenarios through code) is the only reliable way to verify end-to-end flows.